This is mine just before we finished it completely western red cedar including the floor. It is totally run buy computers and controllers and has 3 HAF on the back wall.
The greenhouse can run off a bank of battries that are kept charged as long as the electric is on, when power is off solar panles keep the bats charges, when all that fails there is a 7500 watt propane run gen that will kick in. This took me 35 years to plan and 7 months to build.
Picture to left shows new section has a 12/12 roof pitch left wall has shade cloth inside
center picture Light controllers Irrigation Controller and 40000 btu propane forced air furnace.
picture on right looking from old redone greenhouse right wall 12/24/110 volt converters left of picture is the bottom heated beds for young plants lower left my nap chair. The roof panels have UV protection built in, all windows and roof double wall poly.




Reply With Quote


